[Sep 14, 2021] New 2021 SAP C-TS422-2020 Exam Dumps with PDF from DumpStillValid (Updated 82 Questions) [Q40-Q57]

Share

New 2021 C-TS422-2020 exam questions Welcome to download the newest DumpStillValid C-TS422-2020 PDF dumps (82  Q&As)

P.S. Free 2021 SAP Certified Application Associate C-TS422-2020  dumps are available on Google Drive shared by DumpStillValid

NEW QUESTION 40
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Whether a material master fieldis required, changeable, displayed, or hidden
  • B. Which material master views can be maintained
  • C. Whether material numbers are assigned internally or externally
  • D. Which transaction you can use to create a new material

Answer: A,B

 

NEW QUESTION 41
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
  • C. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.

Answer: C

 

NEW QUESTION 42
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Assign the alert profile to the overall profile.
  • B. Create object selection variant for product-related alerts.
  • C. Create object selection variant for resource-related alerts
  • D. Create object selection variant for transportation lane-related alerts.
  • E. Assign the overall profile to the authorization profile.

Answer: A,B,C

 

NEW QUESTION 43
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Scheduling agreement schedule line
  • B. Purchase requisition
  • C. Production order
  • D. Stock transport order
  • E. Planned order

Answer: A,B,E

 

NEW QUESTION 44
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?

  • A. Fill up based on the lot size procedure
  • B. Fill up to the safety stock level
  • C. Fill up to the reorder stock level
  • D. Fill up to the maximum stock level

Answer: A

 

NEW QUESTION 45
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Control cycle
  • B. Production supply area
  • C. Rate routing
  • D. Replenishment strategy

Answer: A

 

NEW QUESTION 46
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. Past procurement quantities
  • B. Past quotation quantities
  • C. One-off events
  • D. Past sales order quantities
  • E. Market intelligence

Answer: C,D,E

 

NEW QUESTION 47
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Move time
  • C. Float before production
  • D. Pick/pack time
  • E. Queue time

Answer: A,D,E

 

NEW QUESTION 48
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

  • A. Use batch determination.
  • B. Use the material where-used report.
  • C. Use the material staging report.
  • D. Use the batch information cockpit.

Answer: D

 

NEW QUESTION 49
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.

  • A. Supply Chain Management (SCM)
  • B. Material Requirements Planning (MRP)
  • C. Capacity Requirements Planning (CRP)
  • D. Integrated Business Planning (IBP)

Answer: A,D

 

NEW QUESTION 50
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.

  • A. The display template for material numbers applies to all clients.
  • B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • C. In Customizing you can decide by material type whether to use the long material number.
  • D. The number of leading zeros for internal numbers is client-specific.

Answer: A,B

 

NEW QUESTION 51
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The plant-specific status
  • B. The least restrictive status
  • C. The cross-plant status
  • D. The most restrictive status

Answer: D

 

NEW QUESTION 52
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. Plant Data
  • B. MRP Controller
  • C. MRP Group
  • D. MRP Profile

Answer: C

 

NEW QUESTION 53
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Float after production
  • B. Setup time
  • C. Total replenishment lead time
  • D. Planned delivery time

Answer: A,D

 

NEW QUESTION 54
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Run PP/DS heuristics for repetitive manufacturing.
  • B. Run MRP with automatic selection of production version.
  • C. Assign planned orders manual lying the planning table.
  • D. Run MRP with quotaarrangement.

Answer: A,D

 

NEW QUESTION 55
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Capacity requirements chart
  • D. Orders (dispatched) chart

Answer: A,C

 

NEW QUESTION 56
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with more than one work center
  • B. A production line with prioritized alternative work centers
  • C. A production line with an alternative sequence in the routing
  • D. A production line with a parallel sequence in the routing

Answer: A

 

NEW QUESTION 57
......

C-TS422-2020 exam questions from DumpStillValid dumps: https://www.dumpstillvalid.com/C-TS422-2020-prep4sure-review.html (82  Q&As)