
Oracle 1Z0-1075-21 Practice Test Pdf Exam Material
1Z0-1075-21 Answers 1Z0-1075-21 Free Demo Are Based On The Real Exam
Oracle 1Z0-1075-21 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
NEW QUESTION 11
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.
- A. Work Order (WO-1025) is not a Plan-to-produce Work Order.
- B. Work Order (WO-1025) is not a Configured item Work Order.
- C. Work Order (WO-1025) is not a Pick-to-order Work Order.
- D. Work Order (WO-1025) is not a Drop-ShipWork Order.
- E. Work Order (WO-1025) is not a Back-to-Back Work Order.
Answer: B,D
NEW QUESTION 12
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.
- A. Reverse resources charged to a work order.
- B. Reverse material issued to a work order.
- C. Reverse from reject to ready.
- D. Reverse the product at the last operation.
- E. Reverse at an operation.
- F. Reverse from scrap to ready.
Answer: A,B,C,F
NEW QUESTION 13
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and thecorresponding HTTP action available with Manufacturing Cloud.
- A. Work Order Status GET method
- B. Resource transaction GET method
- C. Work Orders GET method
- D. Resource transaction POST method
- E. Work Orders PATCH method
- F. Work Order Status POST method
Answer: A,C,D,E
NEW QUESTION 14
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.
- A. Operations
- B. Manufacturing Lead Time
- C. Operation Items
- D. Resources
- E. Production Line
Answer: A,C,D
NEW QUESTION 15
Identify three types of Item Quantities displayed in the Work Order History tab.
- A. Total Quantity
- B. Remaining Quantity
- C. Completed Quantity
- D. In Process Quantity
- E. Scrapped Quantity
Answer: B,C,E
NEW QUESTION 16
Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle Manufacturing Cloud.
- A. Resource calendars of the work centers involved
- B. Plant calendar exceptions
- C. Resource calendar exceptions
- D. The shifts are defined in the plant calendar
- E. The lot size of the item
- F. The primary work definition of the item
Answer: C,D,E,F
NEW QUESTION 17
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of productsmanufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally.
Identify two different ways of achieving this requirement.
- A. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Item Organization
- B. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and CorporateEngineering organization as Inventory Organization.
- C. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Item Organization.
- D. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Inventory Organization.
- E. Set up Plants as Inventory Organizations, Distribution Centers as Inventory Organizations, and Corporate Engineering organizations as Item Organization.
Answer: A,E
NEW QUESTION 18
You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.
- A. Select the Count Point check box while defining the Standard Operation.
- B. Ensure that the Charge Type of the resource is Automatic.
- C. Deselect the Count Point check box while defining the Standard Operation.
- D. Select the Automatically Transact check box while defining the Standard Operation.
Answer: A
NEW QUESTION 19
Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the MorningShift and the remaining units are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?
- A. Select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
- B. Do not select the Available24 Hours check box and in the Resource Availability region, enter 60% against the resource LATHE in the Morning Shift column.
- C. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
- D. Select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.
- E. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.
- F. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 40% against the resource LATHE in the Evening Shift column.
Answer: A,B
NEW QUESTION 20
Which entity should you use to configure the manufacturing plant in Functional Manager?
- A. Organization
- B. Plant
- C. Business Unit
- D. Legal Entity
Answer: B
NEW QUESTION 21
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?
- A. Production Operator
- B. Manufacturing Engineer
- C. Production Supervisor
- D. Manufacturing Supervisor
- E. Production Engineer
Answer: B
NEW QUESTION 22
You arereviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?
- A. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, andclick Send.
- B. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
- C. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
- D. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.
Answer: C
NEW QUESTION 23
Your customer has completed the required setup steps for automatic work definition. Identify the option that shows the navigation steps needed to create an automaticwork definition.
- A. Manufacturing > Work Definition> Manage Standard Operations> Create automatic definition
- B. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic work definition
- C. Manufacturing> Work Definition> Manage Standard Operations> Select default standard operation> Actions> Create automatic work definition
- D. Product Management> Product Information Management> Items> Edit Item > Actions> Create automatic work definition
Answer: C
NEW QUESTION 24
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
- A. Costs for purchase components P1and P2 are not defined in cost accounting.
- B. Create Accounting was not initiated.
- C. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
- D. Create Accounting Distributions was not initiated.
Answer: D
NEW QUESTION 25
A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.
- A. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW
- B. Define Local sourcing rule for organization MP: Source Type Make At, Source MP
- C. Define Local sourcing rule for organization DW: Source Type Make From, Source MP
- D. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP
Answer: B,D
NEW QUESTION 26
To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.
Identify the action that meets this requirement.
- A. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
- B. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
- C. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having high inventory stock.
- D. Change the Supply Type = Push in Itemdefinition and Work Definition, for subassemblies having high inventory stock.
Answer: B
NEW QUESTION 27
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.
- A. Transfer Transactions from Inventory to Costing
- B. Transfer Transactions from Production to Costing
- C. Transfer Costs to Cost Management
- D. Create accounting
Answer: B
NEW QUESTION 28
In a Manufacturing Cloud post productionsupport environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.
Identify two reasons.
- A. The operations are missing sequence.
- B. The work order operations do not have operations start or completion date.
- C. The scheduled resources are not part of the organization selected by the user.
- D. None of the operations include scheduled resources.
Answer: A,D
NEW QUESTION 29
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.
- A. Oracle Business Intelligence Standard Edition
- B. Oracle Business Intelligence Enterprise Edition
- C. Oracle Business Intelligence Publisher
- D. Oracle Business Intelligence Application
Answer: C
NEW QUESTION 30
In a manufacturingcloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.
- A. Report Material Transactions by Quantity and Serial Number
- B. Report Cost Transactions
- C. Report Resource Transactions
- D. Report Receipts
- E. Report Component Returns
Answer: A,C
NEW QUESTION 31
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception andwho gets notified after an exception is raised?
- A. The Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated notification.
- B. The Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification.
- C. The Production Operator can report anexception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant.
- D. The Production Operator can report and exception and the application generates a notification that is sent to all users who have access to the manufacturing plant.
Answer: C
NEW QUESTION 32
A plantruns 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours.
The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
- A. 12:30 PM
- B. 2:00 PM
- C. 4:00 PM
- D. 8:00 PM
- E. 1:00 PM
Answer: C
NEW QUESTION 33
Identify the three sources from which supply chain orchestration (SCO) can create the work orders.
- A. Order Management
- B. Planning
- C. Inventory Min-Max Planning
- D. Quality
- E. Procurement
Answer: A,B,E
NEW QUESTION 34
You are setting up Fusion Manufacturing to support Back-to-BackFulfillment.
Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-back item components and resources.
- A. Select the Used in Planning check box in the new Work Definition.
- B. Select the Used in Planning check box inthe Work Definition Names.
- C. Select the Used in Planning check box in the item definition.
- D. Select the Used in Planning check box in the Work Structure.
Answer: B
NEW QUESTION 35
......
1Z0-1075-21 [Oct-2022] Newly Released] Exam Questions For You To Pass: https://www.dumpstillvalid.com/1Z0-1075-21-prep4sure-review.html
