NEW QUESTION # 19
The Timebox to deliver the online reservation system through the Hoy Hall website has experienced a major issue. During Timebox C a test was completed to simulate an attack on the financial element of the online reservation system, with the intention of finding security weaknesses. It was found that it was potentially possible to gain access to the system, its functionality and data. Further work is therefore needed to meet the information security elements of a customer financial transaction.
Answer the following question about the actions to be taken by each role.
Column 1 describes a list of actions related to dealing with the security issue with the hotel reservation system.
Column 2 lists the key roles. For each action in Column 1,
select from Column 2 the role that should carry out the action.
Each selection from Column 2 can be used once, more than once or not at all.
Column 1
* Advise how the legislation on the transfer of data will affect the requirements and the system.
* Agree the changes needed to the corporate technical architecture with the Architecture Angels IT support team.
* Ensure the information security vulnerability is communicated to the AA Head Office IT Director.
* Evaluate the impact of proposed security controls on the business and decide on the most suitable solution.
* Reprioritise the requirements on the Prioritised Requirements List associated with the security issue.
Column 2
* Project Manager
* Business Sponsor
* Business Visionary
* Technical Coordinator
* Business Analyst
* Team Leader
* Business Ambassador
* Solution Developer

Answer:

Explanation:

Explanation:
* Advise how the legislation on the transfer of data will affect the requirements and the system.
* E. Business Analyst
* Agree the changes needed to the corporate technical architecture with the Architecture Angels IT support team.
* D. Technical Coordinator
* Ensure the information security vulnerability is communicated to the AA Head Office IT Director.
* A. Project Manager
* Evaluate the impact of proposed security controls on the business and decide on the most suitable solution.
* B. Business Sponsor
* Reprioritise the requirements on the Prioritised Requirements List associated with the security issue.
* C. Business Visionary
Rationale:
* A Business Analyst typically has the expertise to understand and communicate how data transfer legislation impacts system requirements.
* The Technical Coordinator is usually responsible for technical decisions, including those that impact the technical architecture, and would work closely with the IT support team to agree on changes.
* The Project Manager should ensure that key information, such as security vulnerabilities, is communicated to senior management, in this case, the IT Director.
* The Business Sponsor, who is ultimately responsible for the project from a business perspective, would evaluate the impact of security measures on the business.
* The Business Visionary is often tasked with understanding the strategic view of the project requirements and would be suited to reprioritize requirements, especially those with significant implications like security issues.


NEW QUESTION # 20
What action should the Project Manager take to plan the deployment activities?

  • A. Update the Timebox Plan for Timebox C with the activities required to deploy the solution.
  • B. Create a plan of activities to deploy the solution at the end of Timebox C.
  • C. Check the Delivery Plan for deployment activities and update as required.
  • D. Prepare a Timebox Plan for the next Development Timebox.

Answer: C


NEW QUESTION # 21
Answer the following questions about the acceptance criteria within the project.
Decide whether the approach to setting and using acceptance criteria has been applied appropriately and select the response that supports your decision.
The objective of Solution Development Timebox B is to ensure that the front and east wings are finished and approved. The Project Manager has pointed out that acceptance criteria for this part of the solution need to be agreed.
Is this an appropriate action related to acceptance criteria?

  • A. No, because the acceptance criteria for the Solution Development Timebox are just the amalgamation of the individual requirements' acceptance criteria, with nothing extra.
  • B. Yes, because this will allow the Solution Development Team to focus on the quality of the Solution Development Timebox's deliverable as a whole, in order to keep focus on the business need.
  • C. Yes, because it will be easier to set acceptance criteria for the Solution Development Timebox as a whole, rather than setting specific acceptance criteria for each individual requirement.
  • D. No, because the Solution Development Timebox objective will change if any new requirements emerge or any lower priority requirements are de-scoped.

Answer: B

Explanation:
A; Yes, because this will allow the Solution Development Team to focus on the quality of the Solution Development Timebox's deliverable as a whole, in order to keep focus on the business need.
Rationale:
Setting acceptance criteria for the overall deliverables of a timebox is a key practice in Agile to ensure that the work meets the business objectives and quality expectations. It helps the Solution Development Team to understand what is required for the deliverables to be considered complete and acceptable. This aligns with the Agile principle of delivering quality and maintaining a constant pace of development. It also ensures that all team members are aligned on the goals and can focus on delivering value in line with business needs.


NEW QUESTION # 22
Which 2 statements represent appropriate entries for the plan for Post-Project activities?

  • A. Before the product is deployed, the Sales Manager will circulate a copy of the revised sales procedure for processing coffee shop insurance sales.
  • B. The Project Manager will attend Daily Stand-up meetings to observe
    progress.
  • C. Once the new system has been deployed, the time it takes to process sales online will be compared with the time it takes to process new policies sold through telephone sales.
  • D. The Sales Manager will create a company-wide email showing the
    number of policies sold weekly by each of the sales assistants.
  • E. A report showing the number of application forms completed online
    through the website for coffee shop insurance policies will be produced weekly.

Answer: C,E

Explanation:
For the XAN Insurance Company Web Project, the plan for Post-Project activities should include actions and measures that will be undertaken after the project's deliverables have been implemented to ensure sustained benefits, monitor performance, and facilitate continuous improvement.
Selected Statements for the Plan for Post-Project Activities:
D: A report showing the number of application forms completed online through the website for coffee shop insurance policies will be produced weekly.
E: Once the new system has been deployed, the time it takes to process sales online will be compared with the time it takes to process new policies sold through telephone sales.
D: Producing a weekly report on the number of application forms completed online is a clear post-project activity. It provides ongoing monitoring of the project's impact and the effectiveness of the online system in attracting coffee shop insurance policies.
E; Comparing the processing times of online sales to telephone sales after the new system's deployment is an essential post-project activity. It evaluates the efficiency and effectiveness of the new online system, offering insights into improvements and adjustments that may be needed.
Why Other Statements Are Excluded:
A: Creating a company-wide email to show the number of policies sold by each sales assistant weekly is more related to internal sales performance monitoring and motivation rather than a specific post-project activity tied to the project's objectives.
B: Circulating a copy of the revised sales procedure before product deployment is a preparation step for the transition to the new system, rather than a post-project activity.
C: The Project Manager attending Daily Stand-up meetings is part of the ongoing project management and team coordination activities during the project, not a post-project activity.
Topic 2, Hoy Hall Hotel Refurbishment Project
Scenario:
Hoy Hall Hotel Refurbishment Project
(Note:
Hoy Hall, a historic, timber-framed building dating from the 17th century, was originally the residence of the Lords of the Manor of Hoytown. The building is registered as a Heritage Building of Special Interest and is subject to restrictions in terms of development. Used as a hotel for over a century, it has recently fallen into disrepair, and for two years it has been completely unused, accelerating its deterioration. The local community has formed the Action Group "Hoy for Hoy Hall" to save the building, and wants to be closely involved in its future success.
After much discussion Hoy Hall has been purchased by Architecture Angels (AA), a small company whose directors are experienced hoteliers. Five years ago they decided to move into the property renovation business and have recently restored two other similarly-endangered buildings for use as hotels.
Architecture Angels are keen to both support local businesses and to have local people run their hotels, giving them a significant amount of autonomy to do this.
To maintain core consistency, the hotels use Architecture Angels' Head Office services, such as IT operations, accounting, payroll, stocktaking, compliance, human resources and property management. The Head Office is based 80 miles from Hoy Hall.
Recently Architecture Angels commenced an Agile project to renovate Hoy Hall, which has a large downstairs hall and reception area, and 20 potential bedrooms upstairs. The roof requires extensive repairs and the electrical and plumbing installations require complete replacement. The 40 acres of land around the site are overgrown and need to be restored, and the driveway needs re-laying.
In the hotel industry, the trend for direct customer bookings via the internet has had a major impact on the growth of those hotels with this facility. Online booking now accounts for around 80% of room bookings, with only 20% being made via walk-in and telephone enquiries. Before Hoy Hall can open for business, a reservation system must be fully operational.
Architecture Angels use contractors to manage such work and have good
relationships with two local companies: Timber Tigers (TT) who will handle the internal works, and Earth Excavations (EE) who will handle the gardens.
A Project Manager, who has since left the company, started the Feasibility phase. This phase has been continued by the Senior Management Team, which consists of the Sales, Marketing, and Finance Directors and the Chief Executive.
This was scheduled to take a month and has almost been completed. A
Feasibility Assessment has been produced. An Outline Business Case has been completed which assessed the project as being viable.
The Architecture Angels Senior Management Team will be responsible for
Steering the project.
The table below shows the appointments planned for the project team and is subject to change.

Additional Information:
The project is approaching the end of Feasibility. The original Project Manager was involved in drafting a Delivery Plan for the project but not in the outline refurbishment options.
The Senior Management Team generated several options for the refurbishment.
All the options included a landscaping solution for the gardens and re-laying of the driveway, as the solution will not be acceptable without these. However, the best solution for the refurbishment is still under debate. The new Project Manager has suggested that a Feasibility Prototype could consist of paper-based drawings for each option. The "Hoy for Hoy Hall" Action Group thinks that a physically-built representation is mandatory for a prototype and wants a small-scale model of the recommendation for the building. The time available to produce this, however, is limited.
Contracts for resources have not yet been signed and will be postponed until the chosen outline solution has been agreed.


NEW QUESTION # 23
Which 2 actions should the Team Leader take to implement the new Must
Have requirement?

  • A. Discuss the development interfaces and dependencies with the Solution Development Team to ensure the associated Timebox is appropriate.
  • B. Consolidate and circulate an agenda for the workshop.
  • C. Agree to de-scope Should Have and/or Could Have requirements to allow for the new Must Have functionality.
  • D. Add the additional tasks required to create the financial transaction functionality to the Timebox Plan.
  • E. Source and hire a web developer with experience in developing online financial transaction functionality.

Answer: A,D


NEW QUESTION # 24
Using the project timeline given in the Project Scenario, answer the following question about application of Timeboxing on the Hoy Hall project.
Lines 1 to 5 in the table below consist of an assertion statement and a reason statement. For each line identify the appropriate option, from options A to E, that applies.
Each option can be used once, more than once or not at all.

Assertion :
1. All internal works to be assigned to Timber Tigers throughout the project should be consolidated into one Structured Timebox.
BECAUSE
The Investigation step within each Structured Timebox requires everyone working within the team to jointly agree how the requirements of the Timebox will be met.
2. Acceptance criteria for the front rooms to be developed in Timebox A should be described in detail and agreed during the Timebox Kick-Off BECAUSE The aim of the Investigation step within each Timebox is to complete as much of the development work as possible.
3. It is appropriate that both the Evolutionary Development phase and Deployment phase are shown in the first Project Increment.
BECAUSE
Each Timebox should comprise an Evolutionary Development phase and
Deployment phase.
4. It is appropriate that the outputs of Timebox C are scheduled for deployment at the end of the first Project Increment.
BECAUSE
A typical Timebox Plan should provide a schedule of high-level activities for the imminent Project Increment.
5. It is appropriate that Earth Excavations create a detailed plan of activities they will complete during Timebox C.
Reason
BECAUSE
The Solution Development Team is responsible for planning the detail of all the work of each Timebox.

Answer:

Explanation:

Explanation:
For each line, here is the appropriate option from A to E that applies:
* All internal works to be assigned to Timber Tigers throughout the project should be consolidated into one Structured Timebox.
* E. False (Assertion) False (Reason)
* Rationale: It is not practical or in line with Agile principles to consolidate all internal works into one Structured Timebox, as the work will likely need to be spread over multiple Timeboxes.
Additionally, the Investigation step involves agreeing on how to meet the requirements of the Timebox, not necessarily consolidating all work into one.
* Acceptance criteria for the front rooms to be developed in Timebox A should be described in detail and agreed during the Timebox Kick-Off
* B. True (Assertion) True (Reason) BUT the reason does not explain the assertion
* Rationale: While it is true that acceptance criteria should be agreed upon during the Timebox Kick-Off, the reason given is incorrect because the aim of the Investigation step is not necessarily to complete as much development work as possible but to plan and understand the work that will be carried out.
* It is appropriate that both the Evolutionary Development phase and Deployment phase are shown in the first Project Increment.
* A. True (Assertion) True (Reason) AND the reason explains the assertion
* Rationale: Each Timebox should indeed include both Evolutionary Development and a Deployment phase. This assertion and reason correctly align with the concept of Timeboxing in Agile.
* It is appropriate that the outputs of Timebox C are scheduled for deployment at the end of the first Project Increment.
* A. True (Assertion) True (Reason) AND the reason explains the assertion
* Rationale: The typical Timebox Plan does provide a schedule of high-level activities for the imminent Project Increment, which would include planning for deployment.
* It is appropriate that Earth Excavations create a detailed plan of activities they will complete during Timebox C.
* C. True (Assertion) False (Reason)
* Rationale: While it is true that Earth Excavations should create a detailed plan for their activities in Timebox C, the reason is incorrect as the Solution Development Team is not solely responsible for planning all work details within a Timebox. This task would typically be a collaborative effort involving all relevant parties.


NEW QUESTION # 25
During Refinement in Timebox B, a Review Session was scheduled for the Business Visionary to review the products completed during this Timebox, and to agree what needed to be done before these would be acceptable.
Is this an appropriate application of Agile Project Management for this project?

  • A. No, because early and frequent visibility of the product features will maintain engagement with the stakeholders.
  • B. Yes, because this allows each team member working in the Timebox to provide a short progress report and raise any issues that hinder their progress.
  • C. No, because only members of the Solution Development Team are permitted to attend Review Sessions.
  • D. Yes, because this will enable the Solution Development Team to ensure they are on track to deliver a viable solution.

Answer: D


NEW QUESTION # 26
Which 2 statements represent appropriate entries for the Development
Approach Definition?

  • A. An easy to use web development tool called 'WebMatrix' is to be used to develop and maintain the website extension.
  • B. Once deployed, the number of policies sold through traditional telephone sales will be compared with the number of sales processed online through the website.
  • C. Accessibility and performance of the new online quotation area is to be tested using a tool called Sitebeam.
  • D. The Sales Manager will introduce an awards or bonus scheme, designed to create competition between the sales assistants.
  • E. The Finance Director has requested a detailed report be produced after
    12 weeks, showing costs to date and forecast cost to complete.

Answer: A,C

Explanation:
For the XAN Insurance Company Web Project, the Development Approach Definition document should outline the methodologies, tools, and techniques to be used during the development process of the project. It focuses on how the project will be executed in terms of technical and management practices.
Selected Statements for the Development Approach Definition:
C; An easy to use web development tool called 'WebMatrix' is to be used to develop and maintain the website extension.
E; Accessibility and performance of the new online quotation area is to be tested using a tool called Sitebeam.
C: This statement directly specifies a tool (WebMatrix) that will be used for web development and maintenance in the project. It is a clear choice regarding the technical approach and infrastructure, making it suitable for inclusion in the Development Approach Definition.
E: Mentioning Sitebeam as a tool for testing accessibility and performance outlines specific methods for ensuring quality and usability in the development process. It provides actionable information on how testing will be conducted, fitting the criteria for the Development Approach Definition.
Why Other Statements Are Excluded:
A: Introducing an awards or bonus scheme to create competition among sales assistants pertains more to internal sales team management and motivation strategies rather than the technical or methodological approach to developing the project.
B: Comparing traditional telephone sales with online sales is related to the project's performance measurement and post-implementation review, not the development approach or methodology used during the project.
D: The request from the Finance Director for a detailed cost report is related to project financial management and monitoring. While important, it does not detail the technical or methodological approach to developing the project's deliverables.


NEW QUESTION # 27
Which 2 statements represent appropriate entries for the Development
Approach Definition?

  • A. An easy to use web development tool called 'WebMatrix' is to be used to develop and maintain the website extension.
  • B. The Finance Director has requested a detailed report be produced after 12 weeks, showing costs to date and forecast cost to complete.
  • C. Once deployed, the number of policies sold through traditional telephone sales will be compared with the number of sales processed online through the website.
  • D. Accessibility and performance of the new online quotation area is to be tested using a tool called Sitebeam.
  • E. The Sales Manager will introduce an awards or bonus scheme, designed to create competition between the sales assistants.

Answer: A,D

Explanation:
For the XAN Insurance Company Web Project, the Development Approach Definition document should outline the methodologies, tools, and techniques to be used during the development process of the project. It focuses on how the project will be executed in terms of technical and management practices.
Selected Statements for the Development Approach Definition:
C: An easy to use web development tool called 'WebMatrix' is to be used to develop and maintain the website extension.
E: Accessibility and performance of the new online quotation area is to be tested using a tool called Sitebeam.
C: This statement directly specifies a tool (WebMatrix) that will be used for web development and maintenance in the project. It is a clear choice regarding the technical approach and infrastructure, making it suitable for inclusion in the Development Approach Definition.
E: Mentioning Sitebeam as a tool for testing accessibility and performance outlines specific methods for ensuring quality and usability in the development process. It provides actionable information on how testing will be conducted, fitting the criteria for the Development Approach Definition.
Why Other Statements Are Excluded:
A: Introducing an awards or bonus scheme to create competition among sales assistants pertains more to internal sales team management and motivation strategies rather than the technical or methodological approach to developing the project.
B: Comparing traditional telephone sales with online sales is related to the project's performance measurement and post-implementation review, not the development approach or methodology used during the project.
D; The request from the Finance Director for a detailed cost report is related to project financial management and monitoring. While important, it does not detail the technical or methodological approach to developing the project's deliverables.


NEW QUESTION # 28
Several of the web developers working on the project have no Agile
experience. When answering the questions in the Project Approach
Questionnaire (PAQ), the Project Manager could not agree with the statement
'all members of the project understand and accept the DSDM approach'.
What action should the Project Manager take?

  • A. Replace the web developers with experienced Agile practitioners.
  • B. Agree with the statement in the PAQ and keep a close watch on the web developers throughout the project.
  • C. Organize a training workshop to brief all project-level and Solution Development Team roles in the Agile approach.
  • D. Accept that the web developers are experts in their field and will be adopting their own approach throughout the project.

Answer: C


NEW QUESTION # 29
Time is running short and the Must Have requirements for the data entry screen of the web page, as recorded in the Prioritised Requirements List, are not going to be completed on time.
What action should the Project Manager take?

  • A. Accept that the Must Have requirements will not be delivered on time.
  • B. Amend the end date in the Delivery Plan.
  • C. Change the end date of the Timebox.
  • D. Ensure that this issue is escalated to the project level roles.

Answer: D


NEW QUESTION # 30
Answer the following questions about the acceptance criteria within the project.
Decide whether the approach to setting and using acceptance criteria has been applied appropriately and select the response that supports your decision.
During Solution Development Timebox A, a new Health and Safety requirement arises: the front door is required to have wheelchair access. This is a legal requirement and is a Must Have before any staff or general public access can be allowed. The Solution Development Team will work with the Local Planning Authority Officer, the specialist who identified the requirement, to identify further acceptance criteria for Solution Development Timebox A.
Is this an appropriate action related to acceptance criteria?

  • A. Yes, because the Local Planning Authority Officer owns the justification for the new requirement.
  • B. No, because this new requirement would NOT be included in the original Prioritised Requirements List and therefore does NOT need acceptance criteria to be defined.
  • C. Yes, because the new requirement needs to be understood, built and delivered in this Timebox.
  • D. No, because the Business Visionary is responsible for defining acceptance criteria.

Answer: C

Explanation:
A: Yes, because the new requirement needs to be understood, built and delivered in this Timebox.
Rationale:
Agile Project Management is adaptable to changes, even late in the development process. The introduction of a new Health and Safety requirement, such as wheelchair access, which is a legal and must-have requirement, needs to be incorporated into the project as soon as it is identified. Working with the Local Planning Authority Officer to define acceptance criteria ensures that the requirement is clearly understood and that the solution developed meets the necessary legal standards. This approach ensures that the team can immediately address the new requirement and integrate it into the current work cycle, aligning with Agile's principle of welcoming changing requirements, even late in development, for the customer's competitive advantage.


NEW QUESTION # 31
The Solution Development Team are progressing through the first Structured Timebox.
What should the Project Manager do to lead the team at this time?

  • A. The Project Manager should do nothing during a Timebox.
  • B. Attend the Daily Stand-up and discuss any problems at the end.
  • C. Update the Team Board with a summary of team progress and the current status of work.
  • D. Maintain a tight control on progress, recording all discussions and making all decisions.

Answer: B


NEW QUESTION # 32
When preparing for the workshop, which 2 items should the Workshop Facilitator be provided with?

  • A. Background to the disagreement and the reasons for this.
  • B. A step-by-step guide to running an effective workshop.
  • C. Hints and tips on how to influence and persuade others.
  • D. Empowerment to discuss any wider project issues that may arise during the workshop.
  • E. An understanding of the decision-making process.

Answer: A,E

Explanation:
The two items that the Workshop Facilitator should be provided with when preparing for the workshop are:
*B. An understanding of the decision-making process. This will help the facilitator guide the discussion and help the group reach a consensus.
*C. Background to the disagreement and the reasons for this. This will help the facilitator understand the context of the disagreement and facilitate a more effective discussion.
Please note that while hints and tips on how to influence and persuade others (option A), empowerment to discuss any wider project issues that may arise during the workshop (option D), and a step-by-step guide to running an effective workshop (option E) could be helpful, they are not as crucial as understanding the decision-making process and the background to the disagreement for this specific workshop.


NEW QUESTION # 33
Answer the following questions about the acceptance criteria within the project.
Decide whether the approach to setting and using acceptance criteria has been applied appropriately and select the response that supports your decision.
The requirement to 'install a heat reclamation system' shows as a Should Have in the Prioritised Requirements List. During Investigation in Solution Development Timebox B, the Project Manager advised the team NOT to set detailed acceptance criteria for this requirement until later in the Timebox, since the requirement may have to be dropped and the work would be wasted.
Is this an appropriate action related to acceptance criteria?

  • A. Yes, because the acceptance criteria might need to be changed during the Solution Development Timebox.
  • B. Yes, because only Must Have requirements should be fully understood.
  • C. No, because it indicates that the Solution Development Team has NO intention of delivering the Should Have requirements.
  • D. No, because it is necessary to understand the full detail of all the work for completion in the Solution Development Timebox during Investigation.

Answer: A

Explanation:
B: Yes, because the acceptance criteria might need to be changed during the Solution Development Timebox.
Rationale:
In Agile Project Management, flexibility is key. It is important to prioritize work based on the value it provides and the necessity of the requirement. "Should Have" requirements are important but not critical, and they can be subject to change as the project progresses and as more information becomes available. Deferring the detailed setting of acceptance criteria for a "Should Have" requirement that might be dropped is a practical approach to managing workload and focusing efforts on the most critical aspects of the project first. This approach is in line with Agile's principle of responding to change over following a fixed plan.


NEW QUESTION # 34
Using the Project Scenario and the additional information provided for this question in the Scenario Booklet, answer the following questions about Feasibility.
Remember to limit your answers to the number of selections requested in each question.
Which 2 statements describe the appropriate application of Agile Project Management when developing the Solution Architecture Definition (SAD)?

  • A. The SAD must include a physically-built miniature model of the Hoy Hall building.
  • B. Paper-based drawings are to be used for each option being considered for the building and gardens.
  • C. The SAD should contain high-level costs for all elements of each solution option.
  • D. The views of the 'Hoy for Hoy Hall' Action Group members are NOT relevant to the business decision made by Architecture Angels' Finance Director when approving the final option.
  • E. The Architecture Angels' Marketing Director can request a SAD to illustrate the achievability of complex elements of the solution.

Answer: B,E

Explanation:
In the context of Agile Project Management when developing the Solution Architecture Definition (SAD), the two statements that are appropriate are:
A: Paper-based drawings are to be used for each option being considered for the building and gardens.
C: The Architecture Angels' Marketing Director can request a SAD to illustrate the achievability of complex elements of the solution.
Here's the rationale:
*A: Agile methodologies support the use of simple and understandable tools that can quickly convey ideas and be easily changed. Paper-based drawings align with this by providing a flexible and adaptable way to represent different options, which can be rapidly modified in response to feedback.
*C: It is important for the Marketing Director, who understands the market and customer needs, to request clarification on complex elements to ensure that the proposed solutions are feasible and aligned with customer expectations. This contributes to creating a solution that is viable both technically and from a business perspective.


NEW QUESTION # 35
Using the Project Scenario answer the following question about the technical quality of the solution to be delivered. An assessment of the maintenance requirement for the new reservation system was made during Feasibility.
Column 1 describes a list of different types of hotel reservation systems considered. Column 2 lists the three DSDM maintainability objectives. For each description in Column 1, select from Column 2 the maintainability objective it would support.
Each selection from Column 2 can be used once, more than once or not at all.
Column 1:
1. Off-the-shelf software with ready-to-use templates that will need to be customised to fully meet Hoy Hall requirements, after deployment.
2. Developing a fully functioning in-house system, developed and hosted by Architecture Angels IT Operations team.
3. All-in-one web-based reservation and accommodation management system built to Hoy Hall's specification.
4. All bookings for Hoy Hall to be scheduled by one of the other two hotels within the group, until a suitable system can be implemented at the site.
5. A spreadsheet is used to capture customer details manually. Data will then be exported into a fully functional system at a later date.
Column 2
* Maintainability is a required attribute of the initial delivered solution
* Deliver first, re-engineer later
* Short-term, tactical solution

Answer:

Explanation:

Explanation:
For each of the descriptions in Column 1, the maintainability objective from Column 2 that each would support is as follows:
* Off-the-shelf software with ready-to-use templates that will need to be customised to fully meet Hoy Hall requirements, after deployment.
* A. Maintainability is a required attribute of the initial delivered solution
* Rationale: Customizing off-the-shelf software indicates a need for the solution to be maintainable from the onset to allow for these adjustments.
* Developing a fully functioning in-house system, developed and hosted by Architecture Angels IT Operations team.
* A. Maintainability is a required attribute of the initial delivered solution
* Rationale: In-house developed systems need to be maintainable to facilitate future changes and enhancements by the team that created them.
* All-in-one web-based reservation and accommodation management system built to Hoy Hall's specification.
* A. Maintainability is a required attribute of the initial delivered solution
* Rationale: A system built to specific requirements will require the ability to maintain and adjust the system as needs evolve, making maintainability a key initial attribute.
* All bookings for Hoy Hall to be scheduled by one of the other two hotels within the group, until a suitable system can be implemented at the site.
* C. Short-term, tactical solution
* Rationale: This is clearly a temporary measure until a proper system is in place, indicative of a tactical solution to address immediate needs.
* A spreadsheet is used to capture customer details manually. Data will then be exported into a fully functional system at a later date.
* C. Short-term, tactical solution
* Rationale: Using a spreadsheet is a stop-gap solution to manage information in the short term, emphasizing the tactical nature rather than long-term maintainability.
Option B is not selected for any of the descriptions as none of them imply an approach of delivering first with the intention to re-engineer later. They all suggest a need for immediate maintainability or a short-term fix, not a re-engineering approach.


NEW QUESTION # 36
Who is responsible for approving that the change in priority of the requirement for a secondary exit from the upstairs of the building accurately reflects the scope of the project in the Prioritised Requirements List?

  • A. Marketing Director, in the role of Business Visionary.
  • B. Project Manager and Architect, in the role of Technical Co-ordinator.
  • C. Project Manager and Solution Development Team.
  • D. Architecture Angels' Senior Management Team.

Answer: D

Explanation:
The Senior Management Team, which includes the roles of the Sales, Marketing, and Finance Directors, and the Chief Executive, is typically responsible for steering the project and making decisions that reflect the overall scope and objectives of the project. They would be the appropriate body to approve changes in the project scope as represented in the Prioritised Requirements List, especially for a requirement that has legal and safety implications, such as a secondary fire exit. This team would ensure that such a change aligns with the strategic goals and compliance requirements of the project.


NEW QUESTION # 37
Which 2 actions should the Business Visionary take to implement the new Must Have requirement?

  • A. Send a company-wide communication to explain the implications of the business change to all interested parties.
  • B. Consolidate and circulate an agenda for the workshop.
  • C. Ensure the marketing and sales teams are working together to deliver the most effective outcome.
  • D. Assess the impact of the new Must Have requirement on the original
    Business Case.
  • E. Source and hire a web developer with experience in developing online financial transaction functionality.

Answer: A,C

Explanation:
To implement the new Must Have requirement for the coffee shop insurance product website with financial transaction functionality, the Business Visionary should focus on actions that align with their role in guiding the project's vision and ensuring it meets business needs. The following actions are most appropriate for the Business Visionary:
Selected Actions for the Business Visionary:
A; Send a company-wide communication to explain the implications of the business change to all interested parties.
D: Ensure the marketing and sales teams are working together to deliver the most effective outcome.
A: As a Business Visionary, communicating the implications of significant business changes, such as the introduction of a new financial transaction functionality, is crucial. This helps in aligning all parts of the organization with the project's objectives and the strategic direction, ensuring everyone understands the change and its benefits.
D: The Business Visionary plays a key role in ensuring that different departments, such as marketing and sales, collaborate effectively to support the project's objectives. By ensuring these teams work together, the Business Visionary helps in maximizing the project's impact and effectiveness in meeting business goals.
Why Other Actions Are Less Suitable:
B: Assessing the impact of new requirements on the Business Case is important, but it's typically a responsibility shared with the Business Sponsor, who has a more direct role in managing the project's financial and strategic alignment.
C: Sourcing and hiring technical expertise is generally a task for the Project Manager or technical leads. The Business Visionary's role is more focused on strategic oversight rather than operational tasks.
E: Organizing and managing workshop details, such as circulating an agenda, might be supported by the Business Visionary, but it's often a task handled by the Project Manager or a designated coordinator to ensure efficient planning and execution of project activities.


NEW QUESTION # 38
How should the Project Manager encourage the contractors to turn up on time?

  • A. Place a penalty clause on all contractors for late arrival.
  • B. Hold a separate Daily Stand-up meeting early in the morning, for the contractors only.
  • C. Appoint Team Leaders to each of the electrical and plumbing teams.
  • D. Encourage open and honest communication to re-establish an environment of trust.

Answer: D


NEW QUESTION # 39
......