Best Quality NCSE-Core Exam Questions Nutanix Test To Gain Brilliante Result! [Q42-Q59]

Share

Best Quality NCSE-Core Exam Questions  Nutanix Test To Gain Brilliante Result!

Preparations of NCSE-Core Exam 2021 Nutanix SE Academy Unlimited 193 Questions

NEW QUESTION 42
A prospect is interested in evaluating Nutanix at no cost for a few months, but wants to useexisting test hardware to deploy a few VMs.
Their primary interest is in experiencing platform management and not application or benchmark performance.
Which approach should an SE recommend?

  • A. Nutanix NX POC
  • B. Nutanix community Edition
  • C. Nutanix Go
  • D. Nutanix Test Drive

Answer: B

 

NEW QUESTION 43
A customer has a requirement to run a single instance Oracle Database VM on AHV that is driving over 250,000 IOPs.
Which AOS feature should be positioned to deliver the highest level of performance?

  • A. Volume Group Load Balancer
  • B. Data Locality
  • C. App Mobility Fabric
  • D. Shadow Clones

Answer: A

 

NEW QUESTION 44
When reviewing Nutanix cluster upgrades, a customer engineer is concerned that their VM will be forced to repeatedly migrate between nodes Which Nutanix feature allows VMs to remain on a host during an AOS upgrade?

  • A. R3
  • B. CVM Autopathing
  • C. Data Locality
  • D. Shadow Clones

Answer: B

 

NEW QUESTION 45
73. Which two VMs require further data analysis to accurately size resources? (Choose two) ??

  • A. prodsrv05
  • B. prodsrv07
  • C. prodsrv06
  • D. prodsrv02

Answer: A,B

 

NEW QUESTION 46
Which CVM service rs responsible for providing storage to the hypervisor?

  • A. Curator
  • B. Zookeeper
  • C. Stargate
  • D. Genesis

Answer: C

 

NEW QUESTION 47
A customer plans to migrate a business critical. high transaction application to Nutanix Currently the application is running on a physical server with 256GB of RAM and 12 CPU cores at > 80% utilization To run the VM on a single NUMA node, which processor configuration should the systems engineer recommend for this workload?

  • A. (2) CPUs (16 Cores each 2.8GHz). 32 Cores total
  • B. (2) CPUs (8 Cores each 6) 1.8GHz). 16 Cores total
  • C. (2) CPUs (8 Cores each 2.1GHz), 16 Cores total
  • D. (2) CPUs (10 Cores each @ 3.4GHz). 20 Cores total

Answer: A

 

NEW QUESTION 48
A prospect is seeking a Nutanix solution for a mission critical application that needs to sustain two simultaneous node outages and prefers that the cluster be able to fully rebuild both data and metadata in the event hardware issues.
what is the minimum number of nodes required for the cluster?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

 

NEW QUESTION 49
A systems engineer is building a private cloud for internal developers that should include self-service and Me cycle management for both Kubernetes containers and SQL databases.
Which additional license feature must be purchased to provide this capability?

  • A. Prism Pro
  • B. Nutanix Flow
  • C. Nutanix Era
  • D. Nutanix Beam

Answer: A

 

NEW QUESTION 50
How long must data be 'write-cold' before Erasure Coding can begin optimization?

  • A. 7 days
  • B. 6 hours
  • C. 1 hour
  • D. 1 day

Answer: A

 

NEW QUESTION 51
A VOI environment based on AHV Cluster is not performing well. The current environment is using only one bridge (BridgeO). An administrator need to verify if nodes are using all network card associated to BridgeO. Which two menus should be used to check the current configuration? (Choose two.)

  • A. Host NICs tab in Hardware menu
  • B. 1.0 Metrics tab VM menu
  • C. Host view in Network menu
  • D. Network Configuration item in Setting menu

Answer: A

 

NEW QUESTION 52
A customer needs to expand an existing cluster to accommodate workloads. The workloads require 5TB of storage capacity (1.2TB of working set data), 64GB of memory, and 10 physical CPU cores. Their current cluster is configured as follows:
* 4x NX-3060-G5 nodes
* Each node is configured with 2x E5-2620v4 processors (8 Cores each), 128GB RAM, 2x 960GB SSDs, and 4x 2TB HDDs
* The cluster is configured as RF2 and is sized for N+1 availability
* Each CVM is configured with 32GB of memory
To maintain optimal metadata balance and data availability, which configuration should be recommended?

  • A. 2x NX-3060-G5 - 2x E5-2620v4 processors, 128GB RAM, 2x 960GB SSDs, 4x 2TB HDDs
  • B. 1x NX-6035C-G5 - 2x E5-2620v4 processors, 128GB RAM, 1x 1920GB SSDs, 5x 4TB HDDs
  • C. 3x NX-1065-G5 - 2x E5-2620v4 processors, 128GB RAM, 1x 1920GB SSDs, 2x 4TB HDDs
  • D. 1x NX-3060-G5 - 2x E5-2620v4 processors, 128GB RAM, 2x 1920GB SSDs, 4x 2TB HDDs

Answer: A

 

NEW QUESTION 53
A prospective customer indicates a requirement to replicate data offsite for a production workload.
Which two questions should the systems engineer ask about the prospect's requirement? (Choose two)

  • A. What compression ratio does your application require?
  • B. How much data needs to be replicated?
  • C. What OS will be depolyed on the server VMs?
  • D. What are the retention requirements?

Answer: B,D

 

NEW QUESTION 54
An administrator receive report that VDI desktop performance in an 8-node Nutanix VDI environment is poor.
Opening applications takes between 1 and 2 minutes. When investigating the issue, the following conditions are found:
* Cluster memory utilization: 80%
* Cluster SSD utilization: 70%
* Average VM CPU wait time: 11 %
* CVM CPU utilization: 75%
Which action should be taken to improve VDI performance?

  • A. Add CPU resources to the cluster
  • B. Increase the amount of SSD storage in the cluster
  • C. Ad memory to the nodes in the cluster
  • D. Increase the number of vCPU cores allocated to the CVM

Answer: C

 

NEW QUESTION 55
Customer requests a 30-day POC to test Microsoft SQL Server performance on Nutanix compared to existing infrastructure.
Which action should be taken to avoid the POC?

  • A. Offer a 10% discount if the customer issues an order without a POC.
  • B. Share database related Nutanix case studies with the customer.
  • C. Recommend the customer install Nuatnix Community Edition.
  • D. Recommend X-ray to facilitate performance testing and use the Xtract tool to minimize the migration.

Answer: B

 

NEW QUESTION 56
A customer previously purchased a Nutanix solution of nine NX-3060 G7 nodes. The customer asks for help to increase the resillency of their environment after power outages to individual racks in their datacenter.
Their current soluction consists of two NX-3460-G7 blocks and a single NX-3160-G7 block placed in a single rack.
What should the systems engineer recommend to this customer?

  • A. Buy three additional NX-3060 upgrade nodes and place them into the NX-3160 block, Enable Rack Awareness.
  • B. Buy one additional node and place it into the NX-3160 block, Spread the blocks over three racks. Ebable Rack Awareness.
  • C. Move one node from each NX-3460 block over to the NX-3160 blocks. Enable Block Awareness.
  • D. Move one node from each NX-3460 block into the NX-3160 block. Spread the blocks over three racks and enable Rack Awareness.

Answer: D

 

NEW QUESTION 57
A systems engineer is creating a configuration in Sizerfor a customer that is building an app for use as an ebooks repository.
The app requires the following twho workloads.
1. 50 generic web server VMs, each with 2 vCPUs on a 4:1 vCPU:CPU ratio, 8GB of RAM, and 100GB of storage each
2. A fileserver workload with 80TB of usable storage available, which contains mostly PDFs and pre- compressed data Any reduction in performance of the web servers must be avoided. After entering the workloads with default options, The Sizer oupouts the configuration shown in the exhibit.
Which adjustment does the systems engineer need to make to the scenario to meet the performance requirements?

  • A. Increse the vCPU:CPU ratio of the Webserver workload to 6:1
  • B. Switch to manual and change the CPUs of the node configuratin to dual 10 core model.
  • C. Switch to manual sizing and increase the RAM of the node configuration to 384GB.
  • D. Increse the RAM of the webserver workload to 10GB per VM.

Answer: C

 

NEW QUESTION 58
A prospective customer asks about failure handing. They have heard all HCI is the same and want to know what happens if 2 nodes fail within 1 hour of each other. if there is capacity in the cluster, how will this failure scenario be handled ?

  • A. Nutanix waits 60 minutes to recover from failures; data loss may occur
  • B. Nutanix begins rebuilds immediately on a failure.
  • C. Every block of data is written to every node in a Nutanix cluster
  • D. The Nutanix RAID array will leverage the hot spare.

Answer: B

 

NEW QUESTION 59
......

Focus on NCSE-Core All-in-One Exam Guide For Quick Preparation: https://www.dumpstillvalid.com/NCSE-Core-prep4sure-review.html

NCSE-Core All-in-One Exam Guide For Quick Preparation: https://drive.google.com/open?id=15LqaOzDpMwGTwa5dFS-DN-sux5SL3hn5