NEW QUESTION 12
Why is Lean Startup included in the 'starting up a project' process in PRINCE2 Agile?
- A. Because it enables agile to be used in challenging and uncertain situations
- B. Because it explains how a small company can grow using traditional technologies
- C. Because it is designed to manage projects, delivering products in timeboxes
- D. Because running a project and setting up a new business are the same
Answer: A
NEW QUESTION 13
Which is a purpose of the quality theme?
- A. To evaluate whether the project continues to be achievable
- B. To determine how the means of delivering products is communicated
- C. To define the specific conditions that enable a product to be usable
- D. To assess any potential improvements to a product
Answer: A
NEW QUESTION 14
Which statement about the waterfall methodology definition is CORRECT?
- A. It is a behavior that involves making things transparent
- B. It states that deadlines should not be moved
- C. It promotes the use of experiments carried out in a scientific way
- D. It has distinct goals for each stage of development
Answer: D
NEW QUESTION 15
When tracking progress, which term describes using agile techniques at the delivery level, and traditional techniques at the direction and management levels?
- A. Typical
- B. Preferable
- C. Effective
Answer: C
NEW QUESTION 16
What is an epic?
- A. A low-level requirement
- B. A fine-grained user story
- C. A detailed feature
- D. A high-level requirement
Answer: D
NEW QUESTION 17
How does agile address the risk associated with the project not being fully understood at the beginning?
- A. By avoiding too much detail at the start
- B. By allowing a lot of detail at the start
- C. By requiring details at the start
- D. By preventing the analysis of details at the start
Answer: D
NEW QUESTION 18
Which statement about the 'accept that the customer doesn't need everything' target is correct?
- A. It can result in the early delivery of a minimum viable product
- B. It is achieved by managing the culture of the team carefully
- C. It gives confidence on the progress of the project
- D. It allows misunderstandings to be dealt with appropriately
Answer: D
NEW QUESTION 19
What is an epic?
- A. The set of products handed over to the users
- B. A high-level user story that is quite broad or vague
- C. A prioritized list of requirements to be delivered in a sprint
- D. A detailed user story with high business value
Answer: B
NEW QUESTION 20
What should the business case state about the minimum viable product (MVP)?
- A. What the MVP is
- B. When the MVP will be defined
- C. That the MVP is the same as project viability
- D. That the MVP must go into operational use
Answer: D
NEW QUESTION 21
Which is often used during a retrospective to capture lessons?
- A. A Glad! Sad! Mad! board
- B. A burn chart
- C. A Kanban board
- D. A Gantt chart
Answer: A
NEW QUESTION 22
How is the 'tailor to suit the project' principle applied in an agile context?
- A. By emphasizing tolerances on what is being delivered
- B. By flexing what is produced to stay in control and deliver value
- C. By fitting releases into planned management stages
- D. By using the Agilometer to assess the project environment
Answer: B
NEW QUESTION 23
How should product-based planning be used as part of PRINCE2 Agile?
- A. To plan by focusing on the features required
- B. To track progress against the team plan
- C. To enable team planning to be predictive
- D. To create the project plan using empiricism
Answer: A
NEW QUESTION 24
Which is a reason for releasing a product into a staging area?
- A. It enables the faster delivery of changes
- B. It enables a phased Waterfall approach
- C. It supports management by exception
- D. It supports regulatory compliance checking
Answer: D
Explanation:
Reference:
%20and%20verification%20process
NEW QUESTION 25
Which is a purpose of the 'controlling stage' process?
- A. To establish whether the project is complete
- B. To draft the plan for the next stage's work
- C. To report stage progress to the project board
- D. To execute and deliver the project product
Answer: C
Explanation:
Reference:
%20remains%20within%20tolerance.&text=Risks%20and%20issues%20are%20kept%20under%20control
NEW QUESTION 26
Which is typically used in agile when estimating detailed requirements during sprint planning?
- A. Trading
- B. T-shirt sizing
- C. Rationalism
- D. Visioning
Answer: C
NEW QUESTION 27
Which statement about the 'directing a project' process is CORRECT?
- A. The project board should attend regular project progress meetings
- B. The project board should make decisions based on the Agilometer risks
- C. A project board member should fulfill the product owner role within a delivery team
- D. The project board should increase the stage-level time tolerance
Answer: C
NEW QUESTION 28
......
PRINCE2 PRINCE2-Agile-Foundation Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
Updated Official licence for PRINCE2-Agile-Foundation Certified by PRINCE2-Agile-Foundation Dumps PDF: https://www.dumpstillvalid.com/PRINCE2-Agile-Foundation-prep4sure-review.html
Newly Released PRINCE2-Agile-Foundation Dumps for PRINCE2 Agile Certified: https://drive.google.com/open?id=1uSnT-qIm1hc4fWbOZVBCB_cZ-1MnRlqb